Q120. If a commercial building is considered to have 100 peak visitors in a day, what is the minimum number of short-term bicycle storage spaces that must be provided to earn one point under Location and Transportation Credit, Bicycle Facilities?

 
 
 
 

Q121. In order to meet the minimum qualifications for Energy and Atmosphere Prerequisite, Fundamental Commissioning and Verification a Commissioning (Cx) agent must have completed the commissioning process activities for a minimum of how many similar projects?

 
 
 
 

Q122. Which of the following items must have safe collection, storage, and disposal for Materials andResources Prerequisite, Storage and Collection of Recyclables?

 
 
 
 

Q123. Which of the following would be most useful to a school project that is attempting to pursue Water Efficiency Credit, Indoor Water Use Reduction?

 
 
 
 

Q124. A new Science Education Center is pursuing LEED certification. Which of the following strategies could be submitted to earn an Innovation in Design credit?

 
 
 
 

Q125. A LEED Building Design and Construction: Schools project pursuing Location and Transportation Credit, Green Vehicles elects to follow Option 2. Green Buses or School-Owned Vehicles. What action must the project take to meet the Option 2 requirements?

 
 
 
 

Q126. The use of lead, mercury, copper and cadmium should be limited because they all

 
 
 
 

Q127. Which of the following strategies is allowed under Energy Atmosphere Credit, Renewable Energy Production, and will help a project achieve Energy Atmosphere Credit, Optimize Energy Performance?

 
 
 
 

Q128. Which of the following strategies can be used to achieve a point in Innovation Credit, Innovation, Option
1.Innovation?

 
 
 
 

Q129. What stage of LEED for Neighborhood Development certification listed below is eligible for points under Building Design and Construction: New Construction, Location and Transportation Credit, LEED for Neighborhood Development Location?

 
 
 
 

Q130. Which of the following products are eligible for a WaterSense label?

 
 
 
 

Q131. Plug-in task lighting will be utilized in a LEED project at all workstations. The task lighting is not included in the installed lighting power calculations for Energy and Atmosphere Prerequisite, Minimum Energy Performance since

 
 
 
 

Q132. In order to comply with Indoor Environmental Quality Credit, Enhanced Indoor Air Quality Strategies, Option 2.Additional Enhanced IAQ Strategies

 
 
 
 

Q133. What is the minimum number of members of the integrated project team for the Integrative Process Prerequisite, Integrative Project Planning and Design?

 
 
 
 

Q134. The owner has stated a desire to provide a variety of non-automobile commuting options for the future occupants.
What credits should the LEED AP suggest to meet this goal?

 
 
 
 

Q135. Which of the following statements is correct when defining the project boundary?

 
 
 
 

Q136. When preparing the Sustainable Sites Prerequisite, Construction Activity Pollution Prevention, the ConstructionGeneral Permit must contain which of the following?

 
 
 
 

Q137. What is the minimum gross floor area required for a Building Design and Construction project to be eligible for certification?

 
 
 
 

Q138. A commercial office building with a footprint of 70,000 ft2 (6 503.2 m2) has an overall site area of 200,000 ft2 (18 580.6 m2). The project design includes 15,000 ft2 (1 393.5 m2) of pedestrian oriented hardscape and 18,000 ft2 (1
672.3 m2)
of vegetated open space. Which of the following is necessary to satisfy the requirement for the outdoor space to be physically accessible when calculating the Sustainable Sites Credit, Open Space?

 
 
 
 

Q139. Which of the following is a leadership extraction practice that rewards projects for choosing materials with closed-loop recycling and take-back programs in LEED?

 
 
 
 

Q140. A project’s massing and site orientation can have a direct impact on which of the following prerequisites?

 
 
 
 

Q141. An urban office building project is installing a cooling tower. To save on potable water, the project would like to usea nonpotable water source to provide 20% of the cooling tower makeup water to achieve the maximum number ofpoints under Water Efficiency Credit, Cooling Tower Water Use. Which nonpotable water source would be the mostappropriate for use?

 
 
 
 

Q142. The Sustainable Sites Credit, Heat Island Reduction takes into account both new and three-year aged Solar Reflectance Index (SRI) values for roofing material because

 
 
 
 

Q143. How is the distance between the project site and the manufacturing location determined for Materials and Resources Credit. Building Disclosure and Optimization – Sourcing of Raw Materials. Option 2. Leadership Extraction Practices?

 
 
 
 

Q144. Increasing which of the following variables will require an increase in the outdoor airflow rate under Indoor Environmental Quality Prerequisite, Minimum Indoor Air Quality Performance?

 
 
 
 