NEW QUESTION 61
Switch-1 and Switch-2 are AruDaOS-CX switches, which are part of a Virtual Switching Extension (VSX) fabric. Switch-2 is the primary member. Switch-2 experiences a power failure while Switch-1 remains up. Switch-2’s power recovers, and Switch-2 reboots.
Is this one of the things that happens when Switch-2 finishes booting?
Solution: Switch-1 downloads its MAC forwarding table from Switch-2.

 
 

NEW QUESTION 62
Refer to the exhibits.


Is this how the switch handles the traffic?
Solution: A frame with destination MAC address, 00:50:56:15:16:28, arrives with a VLAN 10 tag on 1/1/1 on Switch-1. Switch-1 encapsulates the frame with VXLAN and an IP header destined to 192.168.1.2.

 
 

NEW QUESTION 63
A data center has a three-tier topology with ArubaOS-CX switches at each layer, is this a use case for implementing Virtual Switching Extension (VSX) at the core?
Solution: The aggregation layer operates at Layer 2 only, and the core provides Layer 2 and Layer 3 functions.

 
 

NEW QUESTION 64
Refer to the exhibit.

You need to set up an ArubaOS-CX switch to implement Virtual Extensible LAN (VXLAN) WITHOUT Ethernet VPN (EVPN). The exhibit Indicates which servers should be part of the same VXLANs and the desired VNls for the VXLANs. Assume that the network is already configured to permit each ArubaOS-CX switch to reach each other switch’s loopback interface.
Is this part of the process for setting up VXLAN to meet the requirements?
Solution: On Switch-1, create two VXLAN interfaces, one with ID 5010 and one with 1D 5020; both VXLAN interfaces should use 192.168.1.1 as the source IP address.

 
 

NEW QUESTION 65
Does this correctly describe the ArubaOS-CX architecture?
Solution: The AtubaOS-CX software is based on the ArubaOS-Switch software and adds data center features.

 
 

NEW QUESTION 66
Refer to the exhibit. You need to set up an ArubaOS-CX switch to implement Virtual Extensible LAN (VXLAN) WITHOUT Ethernet VPN (EVPN). The exhibit Indicates which servers should be part of the same VXLANs and the desired VNls for the VXLANs. Assume that the network is already configured to permit each ArubaOS-CX switch to reach each other switch’s loopback interface.

Is this part of the process for setting up VXLAN to meet the requirements?
Solution: On Switch-1, create two VXLAN interfaces, one with ID 5010 and one with 1D 5020; both VXLAN interfaces should use 192.168.1.1 as the source IP address.

 
 

NEW QUESTION 67
You need to integrate Aruba Fabric Composer (AFC) with customer datacenter software. Is this integration possible?
Solution: Aruba Fabric Composer (AFC) with Nutanix Hypervisor (AHV)

 
 

NEW QUESTION 68
Is this how you should position switches in the ArubaOS-CX portfolio for data center networks?
Solution: Deploy Aruba 83xx switches as data center leaf switches.

 
 

NEW QUESTION 69
Refer to the exhibit. Switch-1, Switch-2, and the router run OSPF on LAG 100, which is a Layer 3 LAG. Does this correctly explain how to control how core-to-access traffic Is forwarded?

Solution: To reduce the amount of traffic sent over the ISL between Switch-1 and Switch-2.
enable Equal Cost Multi Path (ECMP) on both Switch-1 and Switch-2.

 
 

NEW QUESTION 70
Is this how you should position switches in the ArubaOS-CX portfolio tor data center networks?
Solution: Deploy Aruba CX 8400 switches as core switches for very large three-tier data center networks.

 
 

NEW QUESTION 71
You are using NetEdit to manage AruDaOS-CX switches. You want to deploy a standard config to the switches, but need the config to include a few device-specific settings such as hostname and IP address.
Is this what you should do?
Solution: Create a conformance validation test to deploy the standard part of the configuration.

 
 

NEW QUESTION 72
You plan to use multi-protocol BGP to implement dynamic VRF route leaking on an ArubaOS-CX switch.
Is this a rule for the setup?
Solution: You can only leak routes between up to three VRFs.

 
 

NEW QUESTION 73
You are configuring Ethernet Ring Protection Switching (ERPS) on an ArubaOS-CX switch. Is this a guideline for configuring timers?
Solution: The hold off timer causes ERPS switches to delay unblocking a failed link after the link is restored. This can be useful to prevent frequent topology changes.

 
 

NEW QUESTION 74
Two ArubaOS-CX switches ate part of a Virtual Switching Extension (V5X) fabric. Is this a guideline for configuring the switches’ link-up delay settings?
Solution: Set the link-up delay timer based on the number of MAC forwarding, ARP, and routing table entries.

 
 

NEW QUESTION 75
Refer to the exhibit.

You are adding a VLAN 30, subnet 10.0.30.0/24 to the network shown in the exhibit. (This network is simplified to just the relevant switches for this item.) This subnet belongs in VRF A, and you have added a Layer 3 VLAN 30 interface attached to this VRF on Switch-1. You want to make the services in this VLAN available to devices in 10.1.20.0/24 in VRF B.
Is this part of a valid setup for meeting these requirements?
Solution: Add a route with this command: ip route 10.1.20.0/24 vlan20 vrf A

 
 

NEW QUESTION 76
A data center has a three-tier topology with ArubaOS-CX switches at each layer, is this a use case for implementing Virtual Switching Extension (VSX) at the core?
Solution: The customer wants to deploy a single control plane for the core fabric.

 
 

NEW QUESTION 77
You want to use NetEdit to configure an AtubaOS-CX switch.
Is this a minimum requirement for setting up communications between the switch and NetEdit?
Solution: Enable the REST interface in read-only mode.

 
 