5/5 - (1 vote)

1z0-1075-24 Tested & Approved Oracle Cloud Study Materials

Validate your Skills with Updated Oracle Cloud Exam Questions & Answers and Test Engine

Q17. Your client’s company is in a regulated industries and must keep detailed records of their product manufacturing processes in accordance with the United States Food and Drug Administration (FDA) regulation on electronic records and signatures called 21 Code of Federal Regulations (CFR) Part 11.
You are implementing Oracle E-Signatures and E-Records for securely capturing, storing, retrieving, and printing electronic records and signatures in manufacturing. They enable Deferred Electronic Records and Electronic Signatures for Manufacturing Work Order Release in Oracle Manufacturing Cloud.
Which statement is NOT true about using Deferred Electronic Records and Electronic Signatures for Manufacturing Work Order Release?

 
 
 
 

Q18. In the work execution area, which three infolets are provided to users for instant access?

 
 
 
 
 

Q19. A Plant Manager bought several machines for their ABC manufacturing plant. The plant is set up with a separate cost element set, ABC, in Manufacturing Cloud.
How must the Plant Manager configure these machines so that they are costed to the work order for which operations are performed on them?

 
 
 
 

Q20. Your customer runs two daily shifts in their plant: morning shift and evening shift. A resource, LATHE, is assigned to the work center W1. There are five units of LATHE available, of which three units are available for the morning shift and the remaining units for the evening shift.
Which two actions must the customer perform to associate LATHE with W1?

 
 
 
 
 
 

Q21. Which two reports provide work order cost-related information to Costing users?

 
 
 
 

Q22. Which three can you set as Overcompletion Tolerance Type and its value for a subcomponent yield, so that the job order can report the excess production completion?

 
 
 
 
 

Q23. Your customer has multiple distribution centers and a few manufacturing plants. The plants manufacture different items with some overlap between them. The distribution centers stock parts from all plants.
A Corporate Engineering team is responsible for centrally defining items and catalogs. This team defines the items and sets the attributes for most parameters. The respective distribution centers and manufacturing plants must be allowed to change some attributes locally.
What is the best way to achieve this?

 
 
 
 
 

Q24. During a Manufacturing Cloud implementation, a Production Supervisor wants to close the work orders for the previous month and make sure that they include the correct cost.
What must they do to achieve this?

 
 
 
 

Q25. A Production Operator is reporting an orderless transaction and realizes that the item has to be scrapped because some specifications were not met during one of the operations of the item. While performing orderless transactions, the operator notices that the Scrap and Return from Scrap transaction types are not available to transact.
Which privilege does the operator need to have to use these two transaction types?

 
 
 
 

Q26. Your customer runs production 24 x 7 x 365 and wants to track Overall Equipment Effectiveness (OEE) online.
Which key setup can they use to achieve this?

 
 
 
 
 

Q27. In which two places can you create and edit user-defined work order statuses?

 
 
 
 

Q28. Which option represents all the production exception types that can be reported by a Production Operator in Oracle Manufacturing Cloud?

 
 
 
 
 

Q29. Which three actions can a supervisor perform to annul or correct mistakes in a completed work order, committed by a user while entering work order details?

 
 
 
 
 

Q30. Your customer is a light assembly manufacturing company that doesn’t require shop floor control. A Manufacturing Engineer wants to generate a work definition automatically for some items, and wants to eliminate the explicit maintenance of work definitions.
Which three steps must they perform and verify in the Work Definition area?

 
 
 
 
 

Q31. The pick release of a project work order creates movement requests with the project and the task from the work order.
Which statement is NOT true about this?

 
 
 
 

1z0-1075-24 [Nov-2024] Newly Released] 1z0-1075-24 Exam Questions For You To Pass: https://www.actualcollection.com/1z0-1075-24-exam-questions.html

Related Links: myportal.utt.edu.tt myportal.utt.edu.tt www.stes.tyc.edu.tw myportal.utt.edu.tt www.stes.tyc.edu.tw myportal.utt.edu.tt