NACE-CIP1-001 (Coating Inspector Level 1) Certification Exam is a valuable credential for professionals in the coating inspection industry. Coating Inspector Level 1 certification can help individuals demonstrate their expertise in coating inspection and advance their careers. By completing the certification exam, candidates can gain recognition from employers and clients around the world and increase their earning potential.

 

NO.37 Digital hygrometers

 
 
 
 

NO.38 ISO SA 2.5 is defined as:

 
 
 
 

NO.39 Solvents are added to coating formulations to

 
 
 
 

NO.40 The most important factor resulting in improved job site safety is:

 
 
 
 

NO.41 A NACE Coating Inspector is permitted to transport coating material when:

 
 
 
 

NO.42 If a Thermoset coating is heated it will:

 
 
 
 

NO.43 Excess moisture during holiday testing can cause erroneous indications by creating a path across the surface of the coating to pinholes previously detected, or directly to the signal return connection.
This is often referred to as:

 
 
 
 

NO.44 As a NACE Coating Inspector your responsibility with respect to safety is to:

 
 
 
 

NO.45 Checking is

 
 
 
 

NO.46 You are the NACE Inspector on a tank lining project where a 50% solids epoxy tank lining is being applied. After application of the 19 coat you notice small blisters in some areas of the applied lining.
Your FIRST preferred course of action is to:

 
 
 
 

NO.47 Prior to the pre-job conference you notice that the Inspection and Test Plan does not require a hold point after surface preparation and coating application. In speaking with the owners’ representative in advance of the meeting you sense he/she does not understand the importance of the hold point.
As a NACE CIP Level 1 Inspector your preferred course of action is to:

 
 
 
 

NO.48 You are an inspector on a project where SSPC SP 3 is specified.
What sort of tools should you expect the Contractor to use to achieve the standard?

 
 
 
 

NO.49 The primary difference between Non-Convertible vs. Convertible coatings is:

 
 
 
 

NO.50 Passivation can best be described as:

 
 
 
 

NO.51 If inspectors identify issues of non-conformance during an inspection, they should

 
 
 
 